30 minutes or do 50?
At first I kept myself as a moderator of the measures proposed by Olaf 50 minutes per installation. When I in 2 - and even join in a 4-hour erection, to make me the impression that always takes a list as long as it gives her. After the first training weekend, where we have placed only 30 minutes, I reduced my default to 30 minutes, and lo and behold, it went. Good even. Thursday I had the other evening with 30 minutes of completed standards and they have again been amazed at how quickly and deeply we worked. The inventories were even over, without anyone looked at the clock. Advantage: more people turn to come.
there to opinions or experiences?
0 comments:
Post a Comment